Flotation Equipment

 

ROCK SERVICES PUMP FLOTATION

PLATFORMS

  • FOR ONE TO SIX PUMPS PER PLATFORM

  • SHIPPING FOOTPRINT 8 FT WIDE EXCEPT FOR LARGER UNITS (10 FT AND 12 FT WIDE)

  • FAST AND EASY ASSEMBLY

  • TURNKEY INSTALLATION OPTIONAL

ROCK SERVICES  HOSE FLOTATION COLLARS

  • FOAM FILLED EXTRA HEAVY DUTY HOSE COLLARS

  • 6" TO 30" DIA HOSE

  • NICE BOLT ON CLAMP SYSTEM

  • FOAM FILLED EXTRA HEAVY DUTY CABLE COLLARS

  • 4" TO 6" CABLE DIA

  • FLOAT BALLS

  • MARKERS, ETC;

ROCK SERVICES FLOTATION CELLS

  • US COAST GUARD AND CORE OF ENGINEERS APPROVED

  • HEAVY DUTY HDPE SHELL

  • EPS FOAM FILLED FOR ADDED STRENGTH AND INTEGRITY

  • BUOYANCY UP TO 4,750 LBS/FLOAT CELL.

  • CALL US TO HELP YOU SELECT FROM A WIDE ARRAY OF SIZES.

 

37 Mary Freeman Rd

Newnan, GA 30265

 

Clay Hollis, President

37 Mary Freeman Road

Newnan, GA 30265

clayhollis2322@gmail.com 

Cell: 678-850-6031

Ken Hollis, Engineering

5908 Huron Ct

Hoschton, GA 30548

pumpman@rockservices.net

Cell: 770-633-6400

  • Facebook Social Icon
  • Twitter Social Icon
  • Google+ Social Icon
  • YouTube Social  Icon
  • Pinterest Social Icon
  • Instagram Social Icon